In May 2014 Technical Contracting Solutions P/L was contracted by the Central Highlands Regional Council to upgrade the Springsure 25mtr swimming pool. The existing pool had a problem with storm water flowing into the pool during heavy rain.
pictures of fake women's rolex oyster hublot mamba replica replica swiss made rolex watches 1:1 replica watches china replica watch suppliers richard mille white watch replica chattime replica watches great watch replicas cheap hublot watches replica men fake rolex for sale watch that replicates the solar system clear watch g shock replica hublot replica watches wholesale www.tswatches.cn replica-watch.info replica moissanite watches ball watch replica quality fake watches tag heuer tourbillon black phantom replica hublot referee watch replica breitling replica watches sale replica apollo soyuz watch turbine watch replica fake diamond rolex vs real rolex yatch master vs replicaSpringsure
Blackwater
In October 2014 Technical Contracting Solutions P/L was contracted by the Central Highlands Regional Council to decommission the 25meter and wading pools in the Blackwater Aquatic Centre . This was a sensitive operation as we could not excavate the earth under the concrete .
The project involved cutting the tops off the walls of both pools, coring holes in the base of the pools for drainage then installing compacted fill then top soil and turf. For the wading pool we also refurbished the iconic "mushroom" water feature which is now the centre point of the paved area under shade cover, where the 25 meter pool used to be.
Technical Contracting Solutions P/L was mentioned in the local newspaper regarding this contract.
Read article here
Riverside Centre Fountain
In April 2010 Technical Contracting Solutions P/L was contracted by GPT, the building owner, to refurbish the Riverside Plaza fountain which involved removal of all tiles and surrounding paving then the removal of the stainless steel trough and tile bedding and existing membrane. We then re-membraned the fountain, reinstated the concrete topping and stainless steel trough then refurbished the return outlets, installed new lighting and installed new tiles.
We also polished the existing porphyry paving capping to the lower fountain and relaid the paving around the upper and lower fountains.
Before
After
Before
After
? 2015 Site by AVT